Having around 7 years of professional experience in Control & Instrumentation in Power plant & water Projects. Familiar with construction procedures and other applicable code standards and maintenance.
Having worked experience in Saudi Electricity Company project in Rabigh (Rabigh Power Plant No.2), in Marafiq (Yanbu 1 Power & Water Project), in SWCC (YMWTS-3 & Yanbu III Power and Desalination Plant in Yanbu) & in Ma’aden (Phosphoric Acid Plant PAP Project) in Turaif.
Presently working in Saudi Aramco JRTF EPC 4 project in Baish jizan.
Handled major Power Plants with Steam turbines including super-heated boilers FGD, ESP, MCC, SWGR & DCS, desalination plant & BOP area.
Familiar with knowledge of BS/IEC/ISO/API/ATEX/NEMA/IEEE/NFPA etc. codes and Aramco standards relating to electrical & instrumentation work.
Experience in erection, testing and maintenance of various field instruments like PIT, FIT, LIT, TIT and Level, Pressure switches, etc.
Extensive knowledge of instrument cable laying (main & branch cables) termination and testing, control valves, Panel/Junction Box Installation & communication system.
Having professional experience on inspection, calibration, installation & commissioning of all type of field instruments as per specification.
In-depth knowledge of data sheets, instrument drawings, single line diagram, I/O loop wiring diagrams, P and IDs, calculation and specifications.
Familiar with control & monitoring systems and Equipment’s, DCS, PLCs and SCADA.
Having experience in erection & commissioning of Fire Alarm system, FM200/CO2 system & Deluge system.
Possess excellent command over verbal and written communications.
Responsible to ensure quality work and monitoring work progress.

Hoping for your favorable consideration

Regards,

Azharuddin